IMBA Single Track Loop Complete
Posted: August 24th, 2016
With the completion of the IMBA single track trail (built July 2016) The Northwoods Zip Line Trails are fully open. There is now 2.85 milesRead More...
Posted: August 24th, 2016
With the completion of the IMBA single track trail (built July 2016) The Northwoods Zip Line Trails are fully open. There is now 2.85 miles